PHYSIOTHERAPY SENGER
DEKO-LIGHT designed and implemented the lighting concept for the new Senger physiotherapy practice – achieving a perfect combination of functionality and a welcoming atmosphere.
MODERN THERAPY LIGHTING
With their new physiotherapy practice in Grafing near Munich, the Senger family has fulfilled a dream: a modern therapy center with integrated fitness and training rooms for holistic patient treatment. Together with installation partner Elektro Huml, DEKO-LIGHT developed a flexible lighting system that is fully integrated into the building automation.
THE IMPLEMENTATION
To flexibly support treatment, the therapists can rely not only on glare-free recessed ceiling luminaires (CETI) but also on indirect, shadow-free accent lighting. Linear RGBW lighting from the PLANO series is installed in the ceiling coves of the treatment rooms, allowing for changing light and color atmospheres as needed. The integrated PLANO systems are also used in the offices, providing glare-free illumination through a combination of profile, LED units and aluminum housing.
For general lighting, a 3-phase track system with flexibly positionable LUCEA spotlights in discreet black runs from the entrance area through the corridors to the fitness and training rooms. In the fitness area, the spotlights are supplemented by controllable RGBW lighting. Lighting control is fully integrated into the building control system via DALI/KNX.
DEKO-LIGHT was responsible for both the lighting design and the 3D visualization of the lighting. On-site installation was carried out by electrical partner Elektro Huml.
For general lighting, a 3-phase track system with flexibly positionable LUCEA spotlights in discreet black runs from the entrance area through the corridors to the fitness and training rooms. In the fitness area, the spotlights are supplemented by controllable RGBW lighting. Lighting control is fully integrated into the building control system via DALI/KNX.
DEKO-LIGHT was responsible for both the lighting design and the 3D visualization of the lighting. On-site installation was carried out by electrical partner Elektro Huml.